A good set of shed plans gives you a cut list and a roof pitch. It won't tell you how to make the floor flat, square and still there in ten years.

By Wes Dunbar · Country & Skills6 min read
The shed plan is right about everything except the ground

Pick the plan by the door opening, not by the photo on the cover. A 10x12 shed with a single 32-inch door is a closet with delusions. The same footprint with a pair of doors giving you a 60-inch clear opening will swallow a push mower, a wheelbarrow, two bikes and a bag of concrete, and you'll still get the ladder in. Every shed I've ever helped build, the owner's one regret was the door.

Second thing to check before you buy anything: wall height. Plans love 6-foot-something side walls because it saves a few studs. Stand a rake up inside one. You'll hate it. Look for 7-foot walls or frame them that way yourself, which costs you a handful of 2x4s and buys you shelving you can actually reach.

Read the plan twice with a highlighter

Before a single board gets cut, sit down with the whole thing and mark every dimension that appears more than once. Shed plans, even good ones, contradict themselves. The floor plan says 96 inches, the elevation says 97-1/2 because somebody was measuring to the outside of the sheathing instead of the framing. Find that discrepancy at the kitchen table, not with a circular saw in your hand.

While you're there, work out whether the plan's dimensions are to stud centers or outside faces. Then check the cut list against the framing drawings and count the studs yourself. I've never once had the two match exactly.

Now call the building department. Most places let you put up a shed under a certain size without a permit, but "under a certain size" varies by town, and setback rules from your property line apply either way. If you've got an HOA, check the covenants. This is the cheapest ten minutes in the whole project, and it's the one that keeps you from moving a finished building six feet to the left.

The foundation is your problem, and the plan knows it

Almost every set of plans starts at the floor frame. The ground under it gets a sentence, maybe a sketch of some concrete blocks. That sentence is where most sheds go wrong.

Do it this way. Strip the sod and topsoil out to about a foot past the shed footprint on all sides. Dig down six inches. Fill it with 3/4-inch clean crushed stone, not pea gravel and not "fill" with dirt in it, and compact it in two lifts with a plate compactor you can rent for a morning. Rake it flat and check it with a long level on a straight 2x4, or a string line and a tape.

Then set pressure-treated 4x6 skids on that pad, running the long way, and build the floor frame on top. The gravel drains, the skids stay dry, and the whole thing can be nudged with a pry bar if it ever settles unevenly. Concrete blocks work too, but you have to level each one individually and they love to sink one corner in clay.

A slab is better if you want to park something heavy in there or you're building bigger than 12x16. It's also a different project with a different budget, and it's permanent in a way a gravel pad isn't.

Square once, and check it with a tape

Build the floor frame, then measure both diagonals corner to corner. If they aren't within an eighth of an inch of each other, tap one corner sideways until they are. Nail it off. Then skin it with 3/4-inch tongue-and-groove plywood and check the diagonals again, because sheathing can drag a frame out of square if you fight the tongue.

That floor is your reference surface for everything after it. Walls get built flat on it. The roof sits on those walls. If the deck is square and level, the rest of the build is carpentry. If it isn't, the rest of the build is problem-solving, and you'll be shimming the door for an afternoon.

Build the walls flat, and get a second set of hands

Lay out the plates together, mark the stud locations on both at once with a square, and write an X on the side of the line the stud goes on. Sounds fussy. It's the difference between sheathing that lands on a stud and sheathing that lands on air.

Sheathe the walls while they're lying on the deck. It's faster, the panels square the wall for you, and you're not holding a sheet of OSB overhead. The trade-off is weight. A sheathed 12-foot wall is genuinely heavy and awkward, and you're not standing it up alone. Have somebody there, or sheathe that one wall after it's up and braced.

Leave the sheathing long at the bottom so it laps over the floor frame by an inch and a half. That lap keeps water out of the joint better than any caulk you'll put there later.

Where the day actually goes wrong

Crowned lumber. Sight down every 2x4 before you cut it. Put the crown up in joists and rafters, and send the truly banana-shaped ones back to the pile for blocking. Buy about 10 percent more framing lumber than the cut list says. You'll use it.

Plywood isn't 4x8. It's a hair under, and it's not always the same hair. Don't lay out 16-inch centers assuming the sheet ends exactly on a stud. Mark from your framing layout, not from the last sheet.

Weather. OSB drinks water and swells at the edges, and once swollen it stays swollen. Don't tear off on a Saturday and leave the deck bare for two weeks. Get the floor down and covered, or plan the build so the roof goes on within the same weather window. A cheap tarp and a few furring strips beats a ruined subfloor.

The roof. Drip edge goes under the underlayment on the eaves and over it on the rakes. Most plans skip this entirely. Get it wrong and water tracks back onto your fascia and rots it out in three seasons.

The parts worth doing beyond the plan

Paint or seal every cut end, especially on trim and the bottoms of door stiles. End grain is where rot starts, every time.

Use hurricane ties between the rafters and the top plate. They're a couple of bucks apiece and they're the reason your roof is still attached after a storm. If you're anywhere the wind gets serious, auger-style ground anchors and cable over the frame are cheap insurance for a building that's essentially a sail on gravel.

Build the ramp. A 2x6 deck on 4x4 stringers, pitched so the mower doesn't bottom out, with the top edge notched to sit flush with the floor. You'll use it every week.

And put a window in, or at least a translucent panel. A shed with no light is a shed you dread opening.

What I'd do differently

I'd frame the door opening a full foot wider than I thought I needed and let the header do the work. Doubling a 2x8 over a 6-foot opening is nothing. Widening a finished wall is a Saturday you don't get back.

Ten years from now nobody's going to ask what the siding cost. They'll pull the handle, and either the door swings clean or it drags on the corner that settled. That's the whole review.

Wes Dunbar

Country & Skills

Grew up on an acreage and never quite left. Covers trucks, trades, land, and how to do the thing yourself.

Watch

Watch how it's done

Picked for this article.

From channels we rate. Plays on YouTube.

This Old House

How to Make a Gravel Shed Foundation | Ask This Old House

Andrew Thron Improvements

The Foolproof Shed Foundation! (Works on Flat or Sloped Terrain) - DIY Step-by-Step Guide